7Getting it built
Plan operating costs before buying equipment7.1Plan it as one programme
Plan the stack as one programme, even when it is funded through many bids.
Picture 80 of 100 · its page
- One architecture, many applications.
- Match instruments to layers.
- Lead consortia.
- Demonstrate capability.
Much of the capital for a university AI research stack can come from existing public funding, if the stack is planned as one programme rather than a series of separate bids. The sources differ by country. In Ireland they include national infrastructure calls, EU regional development funds and, for nationally hosted systems, EuroHPC283284. In the UK they include UKRI and the national compute programmes196. In the US, NSF's main instrument programme does not normally fund general-purpose computing285, so state funding and philanthropy carry more of the load. New York's Empire AI consortium, for example, is backed by more than $500 million of public and private money286. In my experience four principles matter.
- One architecture, many applications. Prepare a single plan covering compute, models, data, laboratories and people, with each funding application paying for a defined component. Some funders require duplicate requests to be withdrawn from other schemes283, so a clear component map also prevents double-funding conflicts.
- Match instruments to layers. Use institutional infrastructure funding for owned equipment, shared-facility and multinational funding, such as EU programmes, for facilities built with partners, research centre and doctoral funding for people, industry co-funding for work done with companies, and national compute programmes for work at scale.
- Lead consortia. Shared-infrastructure strands of national programmes are designed for collaboration across institutions283. The institution that proposes the regional node, with partners committed, shapes and hosts the facility.
- Demonstrate capability. Funders weight the capacity to deliver heavily. In the Local Institutional Infrastructure strand of Ireland's INSPIRE call it carried 200 of 1,000 marks283. A team that already builds and runs compute, manages data and develops models is far more credible than one that intends to recruit.
- Department for Science, Innovation and Technology (2025) UK Compute Roadmap, 17 July (updated 23 April 2026). Available at: https:/
/ www. gov. uk/ government/ publications/ uk- compute- roadmap/ uk- compute- roadmap (opens in a new tab) - Higher Education Authority and Research Ireland (2026) INSPIRE Research Infrastructure Programme Phase One: Call Document, May. Available at: https:/
/ hea. ie/ assets/ uploads/ 2026/ 02/ INSPIRE- Phase- One- Call- Document. pdf (opens in a new tab) - Council of the European Union (2021) 'Council Regulation (EU) 2021/1173 establishing the European High Performance Computing Joint Undertaking', 13 July, Articles 11(2) and 14(2) (since amended). Available at: https:/
/ eur- lex. europa. eu/ legal- content/ EN/ TXT/ HTML/ ? uri= CELEX:32021R1173 (opens in a new tab) - National Science Foundation (2023) Major Research Instrumentation (MRI) Program (solicitation NSF 23-519). Available at: https:/
/ www. nsf. gov/ funding/ opportunities/ mri- major- research- instrumentation- program/ nsf23- 519/ solicitation (opens in a new tab) - University at Buffalo (2025) 'Empire AI supercomputing gets funding boost', UBNow, 30 June. Available at: https:/
/ www. buffalo. edu/ ubnow/ stories/ 2025/ 06/ empire- ai- supercomputing- funding. html (opens in a new tab)
7.2What it costs
A small node costs under €1 million; a large cluster up to about €14 million.
Picture 81 of 100 · its page · 2 more for this section
- Plans should say which of three cases applies: a new facility, which must fund building works, power, cooling and an operations team; an extension of an existing data centre, where the incremental cost is mainly hardware, storage and networking; or a federated node hosted by a partner institution, where the university pays for capacity and support rather than a facility.
Capital runs from about €0.5M to €0.9M for a 16-GPU node to about €14.4M ($16M) for a 256-GPU cluster, mostly for the GPUs themselves. A minimal 16-GPU node, run by two or three engineers, costs roughly €0.25M to €0.35M a year. The full stack in the table costs €1.3M to €3.2M a year, before maintenance contracts and model access. Staff are the largest recurring cost. The staff and power figures below are my estimates, at about €100,000 a year fully loaded per person and about €0.20 per kWh (€1 ≈ $1.11 ≈ £0.84; full report, Section 7).
| Layer | Typical starting scale | Capital | Annual running cost |
|---|---|---|---|
| Owned GPU cluster | 16 to 256 Hopper-generation NVIDIA GPUs (H100/H200) | €0.5M–€14.4M | Maintenance contracts |
| Power and cooling | 2 to 32 eight-GPU systems at up to about 10 kW each | – | €0.05M–€0.8M |
| Research engineering and AI operations | 6 to 12 engineers | – | €0.6M–€1.2M |
| Data curation and governance | 2 to 4 specialists | – | €0.2M–€0.4M |
| Verification and research integrity | 2 to 3 specialists | – | €0.2M–€0.3M |
| AI governance, risk and compliance | 1 to 2 specialists supporting an existing senior owner | – | €0.1M–€0.2M |
| Self-driving laboratory in one domain | From open-hardware rigs to a research-grade robot scientist | €0.05M–€1.2M | €0.1M–€0.3M |
| Frontier model access | Institution-wide | – | Varies; academic programmes exist |
Scroll sideways to see the whole table.
The capital figures cover hardware only; the running costs assume a new team. Extending an existing data centre costs far less at the outset. Plans should show both the incremental cost and the full economic cost over five years, including replacing shared plant such as cooling.
Running costs are the hardest part to fund. Capital grants rarely pay to operate the equipment they buy (full report, Section 7.4).
- Ireland's €750M INSPIRE programme does not fund operating salaries or maintenance beyond a project's life. Research Ireland's 2025 infrastructure programme funds two years of maintenance and expects access charges to cover running costs.
- The EuroHPC Joint Undertaking can meet up to 50% of the operating costs of the high-end supercomputers it co-owns, and 35% for mid-range systems such as Ireland's forthcoming CASPIr.
- The UK funds up to £2M a year to run each of a few selected National Compute Resources, but nothing equivalent for other university systems.
- In the US, NSF funds operating costs of up to 15% of the acquisition cost a year, but only for a handful of selected national resources.
University-hosted infrastructure outside those systems generally has no equivalent. Running costs must therefore come from industry membership, grant overheads, research centre roles and paid access, and they need planning before any equipment is bought.
Sharing with industry has limits. Under EU State aid rules, commercial use that relies on the same inputs as the research and takes no more than 20% of a facility's annual capacity can remain ancillary and outside State aid control. Research Ireland builds this into its infrastructure grants, which gives grantees a clear framework: paid commercial use of up to 20% of annual capacity, at full market rate, while qualifying collaborative research with companies counts as academic use. For AI compute, a fifth of the capacity of a 16-GPU node is about 28,000 GPU hours a year: enough for a handful of company projects, but not a sustained commercial service (full report, Section 7.5).
The UK's subsidy control regime asks instead whether commercial use is limited in scope, giving less than 20% of capacity as an example rather than a rule. In the US, federally funded equipment may not undercut private providers and bond-financed facilities face caps on private use. Larger commercial use usually needs separately funded capacity, which is a natural opening for co-investment by developers, investors and industry partners.
Access alone is rarely enough: companies, and SMEs in particular, want expertise. Offer collaborative research, testing and specialist services, with people whose job is to serve companies, as Ireland's Technology Gateways and the UK's Knowledge Transfer Partnerships do.
Build in stages, and plan for refresh. Start by making the AI compute that already exists shareable, then add capacity as demand grows. Public capital arrives through calls every year or two, so plan each call as the next stage of one programme. Later tranches will buy better and more varied hardware for the money than today's shortage prices allow, as alternatives to NVIDIA, such as AMD's accelerators and Google's TPUs, mature. Older GPUs remain useful for inference, fine-tuning and teaching long after they leave the frontier. Keep software portable, and put the larger, longer-lived investment into data, people and the new verification capabilities that AI-generated research requires.
As an order of magnitude, an owned node of 16 GPUs, enough for inference, fine-tuning and teaching, costs roughly €0.5M to €0.9M ($0.6M to $1M) in hardware alone. A cluster of 64 to 256 GPUs, enough also for moderate training, costs roughly €2.2M to €14.4M ($2.4M to $16M). These figures assume 2026 prices of about $300,000 to $500,000 for an eight-GPU Hopper (H100 or H200) system287. Blackwell systems cost more. Each system can draw up to about 10 kW288, so power, cooling and networking add materially to the build.
Compute is only one layer. Table 5 gives indicative orders of magnitude for the others. The staff and power figures are my estimates: staff at a fully loaded cost of about €100,000 a year per engineer or specialist (experienced AI engineers can cost considerably more, while deeper automation could reduce headcount over time), and power at full load, with cooling overhead, at about €0.20 per kWh. Local salaries and tariffs vary. Dollar figures are converted at about €0.90 to the dollar. For sterling, €1 was worth roughly £0.84 at late-October 2026 rates.
Table 5. Indicative costs of a university AI research stack (orders of magnitude, 2026).
| Layer | Typical starting scale | Capital | Annual running cost |
|---|---|---|---|
| Owned GPU cluster | 16 to 256 Hopper-generation GPUs | €0.5M–€14.4M ($0.6M–$16M)287 | Maintenance contracts, plus power below |
| Power and cooling | 2 to 32 eight-GPU systems at up to about 10 kW each288 | – | €0.05M–€0.8M |
| Research engineering and AI operations | 6 to 12 engineers | – | €0.6M–€1.2M |
| Data curation and governance | 2 to 4 specialists for one or two priority datasets | – | €0.2M–€0.4M |
| Verification and research integrity | 2 to 3 specialists in formal methods, statistics and reproducibility | – | €0.2M–€0.3M |
| AI governance, risk and compliance | 1 to 2 specialists in data protection, research ethics and research security, supporting an accountable owner in an existing senior post | – | €0.1M–€0.2M |
| Self-driving laboratory in one domain | From open-hardware platforms costing a few hundred to a few thousand dollars, through conventional automated set-ups of about $50,000, to a research-grade robot scientist costing about £1M ($1.3M)289290291 | €0.05M–€1.2M | 1 to 3 technicians: €0.1M–€0.3M |
| Frontier model access | Institution-wide | – | Varies; free and discounted academic programmes exist5154 |
Scroll sideways to see the whole table.
Taken together, Table 5 implies annual running costs of roughly €1.3M to €3.2M before maintenance contracts and model access. For a modest stack, annual running costs can match or exceed the whole capital cost. For a large cluster they fall to about a fifth. Staff are the largest recurring cost. A minimal node of 16 GPUs, run and supported by two or three engineers, costs roughly €0.25M to €0.35M a year to operate.
The capital figures cover hardware only, and the running costs assume a new team. The economics differ sharply by starting point. Plans should say which of three cases applies: a new facility, which must fund building works, power, cooling and an operations team; an extension of an existing data centre, where the incremental cost is mainly hardware, storage and networking; or a federated node hosted by a partner institution, where the university pays for capacity and support rather than a facility. Plans should also show both the incremental operating cost and the full economic cost over five years, including replacing shared plant such as cooling. An existing data centre lowers the first but not the second. Competitive grants pay for use, through access charges and overheads, rather than for standing capacity, so neither is covered unless use is high and predictable.
- Anthropic (2026) Expanding support for scientists, 27 August. Available at: https:/
/ anthropic. com/ news/ expanding- support- for- scientists (opens in a new tab) - OpenAI (2026) 'Accelerating scientific discovery with ChatGPT for Academic Researchers', 29 July (updated 10 August). Available at: https:/
/ openai. com/ index/ chatgpt- for- academic- researchers/ (opens in a new tab) - IntuitionLabs (2026) 'Data center GPU pricing 2026: the full AI pricing index', updated 11 October. Available at: https:/
/ intuitionlabs. ai/ articles/ data- center- gpu- pricing- 2026 (opens in a new tab) - NVIDIA (n.d.) 'Introduction to the NVIDIA DGX H100 System', NVIDIA DGX H100/H200 User Guide. Available at: https:/
/ docs. nvidia. com/ dgx/ dgxh100- user- guide/ introduction- to- dgxh100. html (opens in a new tab) - University of Toronto (2025) 'With AI and robotics, U of T students build "self-driving" lab for less than $500', 3 July. Available at: https:/
/ www. utoronto. ca/ news/ ai- and- robotics- u- t- students- build- self- driving- lab- less- 500 (opens in a new tab) - Gaulin, M. (n.d.) 'How self-driving labs can cut automation costs by 90 percent', Lab Manager. Available at: https:/
/ www. labmanager. com/ how- self- driving- labs- can- cut- automation- costs- by- 90- percent- 35276 (opens in a new tab) - Brazil, R. (2026) '"Self-driving" labs power up', Nature, 652, 262–264, 2 April. Available at: https:/
/ media. nature. com/ original/ magazine- assets/ d41586- 026- 00974- 2/ d41586- 026- 00974- 2. pdf (opens in a new tab)
7.3A phased start for a regional university
A regional university can start in three years: foundations, first assets, then scale on evidence.
Picture 88 of 100 · its page
- Year 1: foundations.
- Year 2: first assets.
- Year 3: scale on evidence.
- Year 1: foundations. Appoint one programme owner. Take stock of compute and data, including capacity that could be shared, choose two or three priority domains and secure national and international access. Build a small node sized to measured demand, or share one hosted by a partner institution. Hire the first four to six of an eventual six to 12 research engineers. Name an accountable owner for AI governance, with authority to pause AI work that breaches policy or creates unacceptable risk. Adopt policies on research data, ethics, research security and the use of AI agents.
- Year 2: first assets. Prepare one distinctive dataset with an industry partner; adapt an open domain model on it; pilot a low-cost self-driving laboratory; launch an industry membership offer for the campus.
- Year 3: scale on evidence. Grow the cluster in tranches, towards about 64 GPUs if use justifies it; move to a research-grade laboratory only if the pilot has produced data and partners; bid to host a regional node in national programmes, using the track record built in the first two years.
Plan the stack as one programme, even though it will usually be funded through a series of bids, and match each funding instrument to the layer it suits. Funders score the capacity to deliver.
For a regional or technical university, I would sequence the first three years as follows.
- Year 1: foundations. Appoint a single programme owner. Take stock of compute and data, including capacity elsewhere in the institution and region that could be shared, and agree two or three priority domains. Secure federated access to national and international machines, and build a small owned node sized to measured demand, or share one hosted by a partner with the facilities to run it. Hire the first four to six of an eventual six to 12 research engineers. Name an accountable owner for AI governance, with the policies and authority to pause work set out in Section 6.12.
- Year 2: first assets. Prepare one distinctive dataset for AI use with an industry partner; adapt an open domain model on it; pilot a low-cost self-driving laboratory in the domain with the strongest industry pull; and launch an industry membership offer for the campus.
- Year 3: scale on evidence. Expand the cluster in tranches, towards about 64 GPUs if measured use justifies it; move to a research-grade laboratory only if the pilot has produced data and partners; and bid to host a regional node in national programmes, using the track record built in the first two years.
7.4The operations gap
Capital grants rarely pay to run what they buy.
Picture 84 of 100 · its page
- Running costs are harder to fund than capital, and most infrastructure programmes are designed that way: they pay for equipment and expect the host institution to provide the people.
Running costs are harder to fund than capital, and most infrastructure programmes are designed that way: they pay for equipment and expect the host institution to provide the people. The INSPIRE call makes operating salaries, and maintenance beyond the project's life, ineligible283. Research Ireland's 2025 infrastructure programme pays for equipment, up to two years of maintenance and consumables, and training. Staff salaries are not eligible but count towards the host's cost share. Each award needs at least one dedicated technical staff member and a plan for access charges that will cover running costs292. Some funders also share operating costs directly. EU law allows the EuroHPC Joint Undertaking to meet up to 50% of the operating costs of the high-end supercomputers it co-owns, and up to 35% for mid-range systems284. Ireland's forthcoming CASPIr system will be one: EuroHPC will own it jointly with the University of Galway, and the Irish Centre for High-End Computing (ICHEC) will operate it198293. In the US, NSF funds operating costs of up to 15% of the acquisition cost a year, for up to five years, for a handful of university-hosted national computing resources selected through competition294. The UK has committed to a multi-year funding model for public compute196, and its National Compute Resource model gives hosts selected by competition up to £2 million a year towards operations295. University-hosted infrastructure outside those selected systems generally has no equivalent. Operating costs therefore come from host budgets, industry membership, overheads on research grants, research centre roles and paid access. The operating plan matters as much as the capital bid: a university that does not plan for running costs risks expensive equipment that sits idle.
- Department for Science, Innovation and Technology (2025) UK Compute Roadmap, 17 July (updated 23 April 2026). Available at: https:/
/ www. gov. uk/ government/ publications/ uk- compute- roadmap/ uk- compute- roadmap (opens in a new tab) - EuroHPC Joint Undertaking (2026) Invitation to tender to procure CASPIr supercomputer, 27 March. Available at: https:/
/ www. eurohpc- ju. europa. eu/ invitation- tender- procure- caspir- supercomputer- 2026- 03- 27_ en (opens in a new tab) - Higher Education Authority and Research Ireland (2026) INSPIRE Research Infrastructure Programme Phase One: Call Document, May. Available at: https:/
/ hea. ie/ assets/ uploads/ 2026/ 02/ INSPIRE- Phase- One- Call- Document. pdf (opens in a new tab) - Council of the European Union (2021) 'Council Regulation (EU) 2021/1173 establishing the European High Performance Computing Joint Undertaking', 13 July, Articles 11(2) and 14(2) (since amended). Available at: https:/
/ eur- lex. europa. eu/ legal- content/ EN/ TXT/ HTML/ ? uri= CELEX:32021R1173 (opens in a new tab) - Research Ireland (2025) Research Ireland Infrastructure Programme 2025: Call for Submission of Proposals, 26 May. Available at: https:/
/ media. researchireland. ie/ wp- content/ uploads/ 2026/ 02/ Research- Ireland_ Infrastructure- Programme- 2025_ Call- Document. pdf (opens in a new tab) - EuroHPC Joint Undertaking (2025) 'The way is open to building a EuroHPC world-class supercomputer in Ireland', 13 October. Available at: https:/
/ www. eurohpc- ju. europa. eu/ way- open- building- eurohpc- world- class- supercomputer- ireland- 2025- 10- 13_ en (opens in a new tab) - National Science Foundation (2024) Advanced Computing Systems & Services: Adapting to the Rapid Evolution of Science and Engineering Research (solicitation NSF 24-583). Available at: https:/
/ www. nsf. gov/ funding/ opportunities/ advanced- computing- systems- services- adapting- rapid- evolution/ nsf24- 583/ solicitation (opens in a new tab) - UKRI (2025) 'Phase 2 National Compute Resource: expression of interest', 21 October. Available at: https:/
/ engagementhub. ukri. org/ ukri- infrastructure/ phase2- national- compute- resource- expression- of- int/ (opens in a new tab)
7.5Sharing infrastructure with industry
Paid use by industry is capped at a fifth: about 28,000 GPU hours a year on a 16-GPU node.
Picture 85 of 100 · its page
- Publicly funded research infrastructure can serve industry, within limits set by State aid rules.
Publicly funded research infrastructure can serve industry, within limits set by State aid rules. Under the EU framework, commercial use of a research facility is treated as ancillary, and outside State aid control, if it uses the same inputs as the research and takes no more than 20% of the facility's annual capacity296. The Commission's framework treats this as a safe harbour. Research Ireland builds it into its infrastructure grants as the 80:20 rule, which gives grantees a clear framework: paid use by companies under contract or rental may take up to a fifth of annual capacity, charged at full market rate292297. Research Ireland encourages industry use within that limit, and it counts collaborative research with companies that meets the framework's conditions as academic use292. For AI compute, however, a fifth of the capacity of a 16-GPU node is about 28,000 GPU hours a year: enough for a handful of company projects, but not for a sustained commercial service.
Other jurisdictions draw the line differently. In the UK, the Subsidy Control Act 2022 replaced EU State aid rules. Its statutory guidance treats economic activity at a research facility as outside the regime where it is ancillary and limited in scope, giving less than 20% of capacity as an example rather than a fixed threshold298299. In Northern Ireland, EU State aid rules still apply under Article 10 of the Windsor Framework to support that affects trade in goods or electricity between Northern Ireland and the EU, so a facility there may need to check both regimes300. In the US, equipment bought with federal grants may not be used to sell services for less than a private company would charge301. Private use of facilities financed with tax-exempt bonds is capped at 5% of the bond issue for private non-profit universities and 10% for public ones302. Beyond these limits, commercial use usually needs separately funded capacity, priced on market terms, which is a natural opportunity for co-investment by developers, investors and industry partners.
Access alone is rarely enough: companies, especially SMEs, want expertise, testing and specialist services as well as GPU capacity (Section 6.9). Europe is moving the same way: a Horizon Europe topic closing on 2 February 2027 will pilot a single, multi-site scheme giving start-ups, scale-ups and innovative SMEs access to technology infrastructures303. Such schemes also need people whose job is to find and serve companies. Without them, even free services can go unused.
- Research Ireland (2025) Research Ireland Infrastructure Programme 2025: Call for Submission of Proposals, 26 May. Available at: https:/
/ media. researchireland. ie/ wp- content/ uploads/ 2026/ 02/ Research- Ireland_ Infrastructure- Programme- 2025_ Call- Document. pdf (opens in a new tab) - European Commission (2022) 'Communication from the Commission – Framework for State aid for research and development and innovation' (2022/C 414/01), Official Journal of the European Union, C 414, 28 October, paragraph 21. Available at: https:/
/ eur- lex. europa. eu/ legal- content/ EN/ TXT/ HTML/ ? uri= CELEX:52022XC1028(03) (opens in a new tab) - Research Ireland (2026) Research Ireland Infrastructure Programme 2025: FAQs, question 22. Available at: https:/
/ media. researchireland. ie/ wp- content/ uploads/ 2026/ 02/ Research- Ireland- Infrastructure- Programme- 2025- FAQs. pdf (opens in a new tab) - Department for Business and Trade (2025) UK subsidy control regime: statutory guidance, first published 11 November 2022, updated 4 August 2025. Available at: https:/
/ www. gov. uk/ government/ publications/ uk- subsidy- control- statutory- guidance (opens in a new tab) - Farrer & Co (2024) 'Subsidy control: what does it mean for universities and research institutions?', February. Available at: https:/
/ www. farrer. co. uk/ news- and- insights/ subsidy- control- what- does- it- mean- for- universities- and- research- institutions/ (opens in a new tab) - Department for Business and Trade (n.d.) 'Guidance on the scope and application of Article 10 of the Windsor Framework', Complying with the UK's international obligations on subsidy control. Available at: https:/
/ www. gov. uk/ government/ publications/ complying- with- the- uks- international- obligations- on- subsidy- control- guidance- for- public- authorities/ guidance- on- the- scope- and- application- of- article- 10- of- the- windsor- framework (opens in a new tab) - US Code of Federal Regulations, 2 CFR § 200.313, 'Equipment'. Available at: https:/
/ www. law. cornell. edu/ cfr/ text/ 2/ 200. 313 (opens in a new tab) - UIDP (2021) 'Tax exempt bonds and research contracts', session materials reproducing COGR's Tax Issues in Industry-University Relationships and IRS Rev. Proc. 2007-47, 15 April. Available at: https:/
/ uidp. org/ wp- content/ uploads/ 2021/ 04/ Tax- Exempt- Bonds- and- Research- Contracts. pdf (opens in a new tab) - European Commission (2026) 'Pilot access schemes to Technology Infrastructures for European startups, scaleups and innovative SMEs (CSA)', Horizon Europe topic HORIZON-CL4-2027-01-MAT-PROD-47, deadline 2 February 2027, EU Funding & Tenders Portal. Available at: https:/
/ ec. europa. eu/ info/ funding- tenders/ opportunities/ portal/ screen/ opportunities/ topic- details/ HORIZON- CL4- 2027- 01- MAT- PROD- 47 (opens in a new tab)
7.6Design for refresh, and avoid lock-in
In the shortage, older GPUs are holding their value.
Picture 86 of 100 · its page · 1 more for this section
- Lifecycle planning remains essential, but the assumption that GPUs last three to five years is being challenged.
Lifecycle planning remains essential, but the assumption that GPUs last three to five years is being challenged. During the current shortage, rental prices for older GPUs have risen since the start of 2026, by around 38% for the H100 (launched 2022) and 20% for the A100 (launched 2020), according to Silicon Data as reported in August304. Older GPUs stay useful for inference, fine-tuning and teaching long after they leave the frontier. Whether this lasts once supply catches up is uncertain. Plans should therefore provide for refresh without assuming a three-year cycle: add and replace capacity in modules as measured use grows, move older GPUs to inference and teaching, and check what national and international machines can supply before replacing hardware locally.
Lifespan is one question; when to buy, and how to avoid lock-in, is the other. Prices are high (Section 5.6)230, and alternatives to NVIDIA are maturing. Cambridge's new AIRR system, Zenith, is built by Dell and AMD with AMD's Instinct accelerators305306. Google now sells its TPUs, long available only through its cloud, to a select group of customers for their own data centres307, and is building native PyTorch support for them308. Most universities will reach TPUs through the cloud, including the TPU Research Cloud, which is free to accepted researchers who share their work309.
This argues for building AI compute in stages rather than all at once. Start by taking stock of the AI compute that already exists across the institution, its region and national programmes, and make it shareable. Good scheduling and orchestration software can get more research out of hardware an institution already has, and is often a cheaper first step than buying more. Then add capacity in tranches as measured demand grows. Public funding makes this natural: capital arrives through calls every year or two, so a stack planned as one programme (Section 7.1) is built in stages anyway, and each call can buy the hardware then available. Later tranches are likely to buy more for the money: each generation of accelerators typically delivers more performance per euro, shortage pricing should ease, and the choice of suppliers will be wider. Waiting has costs too, so a first owned node sized to current demand still makes sense. The point is not to commit the whole budget at today's prices.
The practical response is to buy hardware in modules on short commitments, keep software portable through open frameworks and containerised workloads, and use national, international and rented capacity for peaks. The larger, longer-lived investment should go into data, people and verification, which keep their value whatever the next generation of hardware looks like.
- Jishnu, A. and Ansari, E. (2026) 'AI memory boom squeezes legacy DRAM supply, pushing prices higher', S&P Global Market Intelligence, 28 January. Available at: https:/
/ www. spglobal. com/ market- intelligence/ en/ news- insights/ research/ 2026/ 01/ ai- memory- boom- squeezes- legacy- dram- supply- pushing- prices- higher (opens in a new tab) - Koundinya, S. (2026) 'Why NVIDIA's six-year-old GPU is still making money', Analytics India Magazine, 17 August. Available at: https:/
/ analyticsindiamag. com/ ai- features/ why- nvidias- six- year- old- gpu- is- still- making- money (opens in a new tab) - Fields, K. (2026) 'UK supercomputer gets £36m boost and AMD's latest AI chips', The Stack, 26 January. Available at: https:/
/ www. thestack. technology/ uk- supercomputer- gets- 36m- boost- and- amds- latest- ai- chips/ (opens in a new tab) - DatacenterDynamics (2026) 'Cambridge University launches £36m Zenith supercomputer', June. Available at: https:/
/ www. datacenterdynamics. com/ en/ news/ cambridge- university- launches- 36m- zenith- supercomputer/ (opens in a new tab) - Sharwood, S. (2026) 'Google to sell its TPUs to some customers, who also fancy big-G GPUs', The Register, 30 April. Available at: https:/
/ www. theregister. com/ off- prem/ 2026/ 04/ 30/ google- to- sell- its- tpus- to- some- customers/ 5220078 (opens in a new tab) - Google for Developers (2026) 'TorchTPU: running PyTorch natively on TPUs at Google scale', 7 April. Available at: https:/
/ developers. googleblog. com/ torchtpu- running- pytorch- natively- on- tpus- at- google- scale/ (opens in a new tab) - Google Research (2026) 'TPU Research Cloud'. Available at: https:/
/ sites. research. google/ trc/ about/ (opens in a new tab)
7.7Where to look
- Each jurisdiction offers routes for each layer.
Each jurisdiction offers routes for each layer. Table 6 gives a few starting points in each. It is not an exhaustive guide, and programmes change quickly.
Table 6. Starting points for funding and accessing a university AI research stack.
| Jurisdiction | Starting points |
|---|---|
| Ireland | The €750M INSPIRE research infrastructure programme for 2026–2031, including shared advanced infrastructure283310; the forthcoming EuroHPC CASPIr system, to be hosted by the University of Galway and operated by ICHEC198293; the AI Factory Antenna in Ireland, led by ICHEC with CeADAR, which gives researchers, start-ups and SMEs access to the French and Luxembourg AI Factories, together with an AI sandbox, a secure data environment and training311; the national Rinn research centres, including Rinn AI, which supports Ireland's National Digital and AI Strategy, and centres for quantum and semiconductors312; HEAnet, the national research and education network, which represents Ireland in the European Open Science Cloud (EOSC)313, and the proposed national EOSC node for research data and services314; for industry-facing services, Enterprise Ireland's Technology Gateways and the four European Digital Innovation Hubs245251; and the US–Ireland R&D Partnership, which funds joint research across Ireland, Northern Ireland and the United States315 |
| European Union | RAISE and the €600M for researcher access to AI Gigafactories197; free access to EuroHPC AI Factories for AI-in-science research and for start-ups316317; Horizon Europe AI-in-science topics for 2026–27, including automated laboratory systems318; the Horizon Europe pilot access scheme to technology infrastructures for start-ups, scale-ups and SMEs303; the AI Gigafactories tender, which closes on 3 December 2026 for Lot 2 and 4 February 2027 for Lot 1, both at 17:00 Luxembourg time319: the facilities will be built by large consortia, and researchers will reach them through public access schemes such as RAISE's197199; and FP10, Horizon Europe's proposed successor from 2028, still under negotiation320321 |
| United Kingdom | Many of the EU routes above, because the UK has been associated to Horizon Europe since January 2024 and has been a EuroHPC participating state since May 2024; EPCC in Edinburgh hosts the UK AI Factory Antenna322323; the Alan Turing Institute, the national institute for AI and data science, now focused on national resilience324; AI Research Resource (AIRR) allocations on Isambard-AI at Bristol and Zenith at Cambridge, including a rapid access route103204305; the UKRI AI strategy, including funding to scale AIRR compute325; AI for Science missions103, with preliminary market engagement on autonomous laboratories in November 2025326; open data for AI from national facilities, such as Diamond Light Source's OpenBind227, and linked administrative data through ADR UK327; the AI Security Institute's Alignment Project, which funds research with compute and API credits alongside grants164; and, for industry-facing services, the Hartree Centre, the Catapults, Knowledge Transfer Partnerships and the Sovereign AI Unit, which pairs investment in start-ups with GPU hours on Isambard-AI215246248328 |
| United States | NAIRR access for researchers and educators192; Genesis Mission project calls, in which universities lead most awards191, and the Genesis Open Models Initiative, which takes outside contributors186; NSF's network of 20 programmable cloud laboratories, for which universities, non-profits and companies could apply194195, and its Advanced Computing Systems & Services competitions294; the Genesis Mission graduate fellowship329; state-backed consortia such as New York's Empire AI286; and, for industry-facing work, NSF's Industry–University Cooperative Research Centers247 |
Scroll sideways to see the whole table.
- Department for Science, Innovation and Technology (2025) AI for Science Strategy, 20 November. Available at: https:/
/ www. gov. uk/ government/ publications/ ai- for- science- strategy/ ai- for- science- strategy (opens in a new tab) - UK AI Security Institute (2026) 'The Alignment Project'. Available at: https:/
/ alignmentproject. aisi. gov. uk/ (opens in a new tab) - US Department of Energy (2026) 'U.S. Department of Energy launches the Genesis Open Models Initiative', 7 August. Available at: https:/
/ www. energy. gov/ node/ 4859769 (opens in a new tab) - US Department of Energy (2026) 'Secretary of Energy Chris Wright announces first Genesis Mission projects selected to accelerate…', 22 July. Available at: https:/
/ www. energy. gov/ articles/ secretary- energy- chris- wright- announces- first- genesis- mission- projects- selected- accelerate (opens in a new tab) - San Diego Supercomputer Center (2026) 'SDSC to lead NSF NAIRR Operations Center', 1 September. Available at: https:/
/ www. sdsc. edu/ news/ 2026/ PR20260901- NAIRR- OC. html (opens in a new tab) - National Science Foundation (2026) [Programmable Cloud Laboratories Test Bed awards] (GovDelivery bulletin), 23 July. Available at: https:/
/ content. govdelivery. com/ accounts/ USNSF/ bulletins/ 421a483 (opens in a new tab) - National Science Foundation (2025) 'NSF to invest in new national network of AI programmable cloud laboratories', 5 August. Available at: https:/
/ www. nsf. gov/ news/ nsf- invest- new- national- network- ai- programmable- cloud (opens in a new tab) - European Commission (2025) European Strategy for AI in Science, 8 October. Available at: https:/
/ research- and- innovation. ec. europa. eu/ strategy/ strategy- research- and- innovation/ our- digital- future/ european- ai- science- strategy_ en (opens in a new tab) - EuroHPC Joint Undertaking (2026) Invitation to tender to procure CASPIr supercomputer, 27 March. Available at: https:/
/ www. eurohpc- ju. europa. eu/ invitation- tender- procure- caspir- supercomputer- 2026- 03- 27_ en (opens in a new tab) - EuroHPC Joint Undertaking (2026) 'EuroHPC Joint Undertaking launches AI Gigafactories call', 30 July. Available at: https:/
/ eurohpc- ju. europa. eu/ eurohpc- joint- undertaking- launches- ai- gigafactories- call- 2026- 07- 30_ en (opens in a new tab) - UKRI (2026) 'Isambard-AI and Zenith AIRR supercomputers: rapid access route', updated 15 October. Available at: https:/
/ www. ukri. org/ opportunity/ isambard- ai- and- zenith- airr- supercomputers- rapid- access- route/ (opens in a new tab) - STFC Hartree Centre (2025) Hartree Highlights 2024–25, September. Available at: https:/
/ www. hartree. stfc. ac. uk/ wp- content/ uploads/ 2025/ 09/ Hartree_ Highlights_ 2024- 25. pdf (opens in a new tab) - Diamond Light Source (2026) 'OpenBind's first data and model release marks a milestone for AI enabled drug discovery', 6 May. Available at: https:/
/ www. diamond. ac. uk/ default/ Home/ News/ LatestNews/ 2026/ OpenBind- s- first- data- and- model- release- marks- a- milestone- for- AI- enabled- drug- discovery. html (opens in a new tab) - Enterprise Ireland Technology Gateway Network (2025) 'What are Gateways?'. Available at: https:/
/ technologygateway. ie/ network/ (opens in a new tab) - UK Research and Innovation (2025) 'Knowledge Transfer Partnership guidance: who can take part', Innovate UK, updated 27 October. Available at: https:/
/ www. ukri. org/ councils/ innovate- uk/ guidance- for- applicants/ guidance- for- specific- funds/ knowledge- transfer- partnership- guidance/ who- can- take- part/ (opens in a new tab) - National Science Foundation (2026) 'About IUCRC', Industry–University Cooperative Research Centers Program. Available at: https:/
/ iucrc. nsf. gov/ about (opens in a new tab) - High Value Manufacturing Catapult (2026) 'What is a Catapult?'. Available at: https:/
/ hvm. catapult. org. uk/ who- we- are/ what- is- a- catapult/ (opens in a new tab) - Enterprise Ireland (2026) 'European Digital Innovation Hubs'. Available at: https:/
/ www. enterprise- ireland. com/ en/ supports/ become- more- innovative/ european- digital- innovation- hubs (opens in a new tab) - Higher Education Authority and Research Ireland (2026) INSPIRE Research Infrastructure Programme Phase One: Call Document, May. Available at: https:/
/ hea. ie/ assets/ uploads/ 2026/ 02/ INSPIRE- Phase- One- Call- Document. pdf (opens in a new tab) - University at Buffalo (2025) 'Empire AI supercomputing gets funding boost', UBNow, 30 June. Available at: https:/
/ www. buffalo. edu/ ubnow/ stories/ 2025/ 06/ empire- ai- supercomputing- funding. html (opens in a new tab) - EuroHPC Joint Undertaking (2025) 'The way is open to building a EuroHPC world-class supercomputer in Ireland', 13 October. Available at: https:/
/ www. eurohpc- ju. europa. eu/ way- open- building- eurohpc- world- class- supercomputer- ireland- 2025- 10- 13_ en (opens in a new tab) - National Science Foundation (2024) Advanced Computing Systems & Services: Adapting to the Rapid Evolution of Science and Engineering Research (solicitation NSF 24-583). Available at: https:/
/ www. nsf. gov/ funding/ opportunities/ advanced- computing- systems- services- adapting- rapid- evolution/ nsf24- 583/ solicitation (opens in a new tab) - European Commission (2026) 'Pilot access schemes to Technology Infrastructures for European startups, scaleups and innovative SMEs (CSA)', Horizon Europe topic HORIZON-CL4-2027-01-MAT-PROD-47, deadline 2 February 2027, EU Funding & Tenders Portal. Available at: https:/
/ ec. europa. eu/ info/ funding- tenders/ opportunities/ portal/ screen/ opportunities/ topic- details/ HORIZON- CL4- 2027- 01- MAT- PROD- 47 (opens in a new tab) - Fields, K. (2026) 'UK supercomputer gets £36m boost and AMD's latest AI chips', The Stack, 26 January. Available at: https:/
/ www. thestack. technology/ uk- supercomputer- gets- 36m- boost- and- amds- latest- ai- chips/ (opens in a new tab) - University College Dublin (2025) '€750 million investment package to transform Ireland's research infrastructure', 27 November. Available at: https:/
/ www. ucd. ie/ newsandopinion/ news/ 2025/ november/ 27/ 750millioninvestmentpackagetotransformirelandsresearchinfrastructure/ (opens in a new tab) - ICHEC (2025) 'The EU and Ireland's Department of FHERIS announce the AI Factory Antenna in Ireland (AIF IRL-Antenna)', 13 October. Available at: https:/
/ www. ichec. ie/ node/ 1114 (opens in a new tab) - Research Ireland (2026) Government announces €460 million investment for seven new Rinn Research Ireland centres, 10 June. Available at: https:/
/ www. researchireland. ie/ news/ rinn- network/ (opens in a new tab) - EOSC Association (2024) 'Building the "people ecosystem" in Ireland: interview with Roberto Sabatino of HEAnet', 4 March. Available at: https:/
/ eosc. eu/ news/ building- the- people- ecosystem- in- ireland- interview- with- roberto- sabatino- of- heanet (opens in a new tab) - Sabatino, R. et al. (2025) Implementing the European Open Science Cloud (EOSC) in Ireland, version 2, Zenodo, 21 July. Available at: https:/
/ zenodo. org/ records/ 16266119 (opens in a new tab) - Research Ireland (n.d.) 'US-Ireland R&D Partnership Programme'. Available at: https:/
/ www. researchireland. ie/ funding/ us- ireland/ (opens in a new tab) - LUMI AI Factory (2026) EuroHPC JU access calls for AI Factories, 5 March. Available at: https:/
/ lumi- supercomputer. eu/ access- calls- for- ai- factories/ (opens in a new tab) - EuroHPC Joint Undertaking (2026) 'Access policy and FAQ' (accessed 25 October 2026). Available at: https:/
/ eurohpc- ju. europa. eu/ access- our- supercomputers/ access- policy- and- faq_ en (opens in a new tab) - EURAXESS (2025) '€100 million AI science pilot projects under Horizon Europe 2026-27', 8 October. Available at: https:/
/ euraxess. ec. europa. eu/ worldwide/ india/ news/ eu100- million- ai- science- pilot- projects- under- horizon- europe- 2026- 27 (opens in a new tab) - EuroHPC Joint Undertaking (2026) 'Call for tenders for the selection of Artificial Intelligence Gigafactory consortia and the establishment of AI Gigafactories', updated 5 November. Available at: https:/
/ www. eurohpc- ju. europa. eu/ call- tenders- selection- artificial- intelligence- gigafactory- consortia- and- establishment- ai_ en (opens in a new tab) - Gaudron, J.-M. (2025) 'New Horizon Europe plan nearly doubles funding', Luxinnovation, 29 July. Available at: https:/
/ luxinnovation. lu/ news/ new- horizon- europe- plan- nearly- doubles- funding (opens in a new tab) - Zubașcu, F. (2026) 'Partial agreement on the next Horizon Europe sets Council on collision course with Parliament in upcoming negotiations', Science|Business, 25 June. Available at: https:/
/ sciencebusiness. net/ news/ planning- fp10/ council- pushes- greater- say- shaping- fp10- priorities (opens in a new tab) - EuroHPC Joint Undertaking (2024) 'United Kingdom joins EuroHPC Joint Undertaking', 12 May. Available at: https:/
/ eurohpc- ju. europa. eu/ united- kingdom- joins- eurohpc- joint- undertaking- 2024- 05- 12_ en (opens in a new tab) - EPCC (n.d.) 'UK AI Factory Antenna: Pilot-UKAIFA'. Available at: https:/
/ www. epcc. ed. ac. uk/ uk- ai- factory- antenna- pilot- ukaifa (opens in a new tab) - Milmo, D. (2026) 'UK can't rely on AI that could be switched off, says Alan Turing Institute chief', The Guardian, 10 October, as reported by The Next Web. Available at: https:/
/ thenextweb. com/ news/ alan- turing- institute- williamson- sovereign- ai- uk (opens in a new tab) - UKRI (2026) 'UKRI AI strategy makes bold choices where UK can lead the world', 19 February. Available at: https:/
/ www. ukri. org/ news/ ukri- ai- strategy- makes- bold- choices- where- uk- can- lead- the- world (opens in a new tab) - Department for Science, Innovation and Technology (2025) 'Sovereign AI open call: autonomous labs – preliminary market engagement', 24 November. Available at: https:/
/ www. gov. uk/ government/ publications/ sovereign- ai- open- call- autonomous- labs/ sovereign- ai- open- call- autonomous- labs- preliminary- market- engagement (opens in a new tab) - UK Research and Innovation (2026) 'Administrative Data Research UK (ADR UK)', area of investment and support. Available at: https:/
/ www. ukri. org/ what- we- do/ browse- our- areas- of- investment- and- support/ administrative- data- research- uk- adr- uk/ (opens in a new tab) - University of Bristol (2026) 'Isambard-AI supercomputer powers £500m UK Sovereign AI fund', 20 April. Available at: https:/
/ www. bristol. ac. uk/ research/ centres/ bristol- supercomputing/ articles/ 2026/ isambard- ai- supercomputer- powers- 500m- uk- sovereign- ai- fund. html (opens in a new tab) - US Department of Energy (2026) 'Energy Department launches Genesis Mission Graduate Fellowship to advance American scientific leadership', 8 October. Available at: https:/
/ www. energy. gov/ articles/ energy- department- launches- genesis- mission- graduate- fellowship- advance- american- scientific (opens in a new tab)