Sections 6 and 7 · the university playbook · plan your stack below

A modest stack is bought once. Running it can cost as much again every year.

For a modest stack, annual running costs can match or exceed the whole capital cost. For a large cluster they fall to about a fifth. Staff are the largest recurring cost.

Block areas drawn to the report’s two ratios · the two rows are not to the same scale · illustrative

€0.5M–€0.9MAs an order of magnitude, an owned node of 16 GPUs, enough for inference, fine-tuning and teaching, costs roughly €0.5M to €0.9M ($0.6M to $1M) in hardware alone.
€0.25M–€0.35M a yearA minimal node of 16 GPUs, run and supported by two or three engineers, costs roughly €0.25M to €0.35M a year to operate.
€1.3M–€3.2M a yearTaken together, Table 5 implies annual running costs of roughly €1.3M to €3.2M before maintenance contracts and model access.

AI at the Core, Section 7.2 and Table 5. The report’s figures; orders of magnitude, 2026. The capital figures cover hardware only, and the running costs assume a new team.

Sections 6 and 7 · the report’s figures; orders of magnitude, 2026

Plan your stack. Three choices, and what the report says about each.

Choose the kind of institution, where you start from and the first scale. Everything below is the report’s own wording and figures. Nothing is calculated.

1Your institution
2Where you start from
3The first scale

This is the plan for a regional or technical university extending an existing data centre with a 16-GPU node. With JavaScript on, you can choose the kind of institution, the starting point and the first scale.

A regional or technical university, extending an existing data centre, starting with a 16-GPU node.

Partnerships
Labs
Models
Data
Compute
People
Place
Build and own, or hold with a partnerRent or federateLead

Outlined and marked “lead”: the layers this kind of institution should put its emphasis on. The marking is this site’s reading of Section 6.2; the stack is Figure 1. Select any layer to read what it is.

Regional or technical university · Section 6.2

Regional and technical universities, including US regional public universities, should prioritise distinctive regional and industry data, applied domain models, an operations team built from existing engineering staff, a right-sized owned node, and federated access for large runs.

An institution that already has a data centre, cooling and operations staff can also host equipment on behalf of others, which is cheaper than each building its own.

Advantage
close industry relationships.
Risk
spreading too thin.
Data · Build and own, or hold with a partner

Unique research datasets, AI-ready

Access to capable models is now widely shared and gives little lasting advantage, but the data each institution holds remains distinctive, so universities should inventory the datasets they and their regions uniquely hold, prepare them for AI use under proper governance, and establish data partnerships with industry.

AI at the Core, Section 6.6

€0.5M–€0.9MAs an order of magnitude, an owned node of 16 GPUs, enough for inference, fine-tuning and teaching, costs roughly €0.5M to €0.9M ($0.6M to $1M) in hardware alone.
€0.25M–€0.35M a yearA minimal node of 16 GPUs, run and supported by two or three engineers, costs roughly €0.25M to €0.35M a year to operate. For a modest stack, annual running costs can match or exceed the whole capital cost.
€1.3M–€3.2M a yearTaken together, Table 5 implies annual running costs of roughly €1.3M to €3.2M before maintenance contracts and model access. Staff are the largest recurring cost.

AI at the Core, Section 6.4, Section 7.2 and Table 5. The report’s figures; orders of magnitude, 2026. The capital figures cover hardware only, and the running costs assume a new team.

What this scale is for

A node of 16 to 32 GPUs is a credible first phase: enough for inference on sensitive data, fine-tuning, teaching and small domain models, but not for sustained institution-wide demand, substantial training or a commercial compute offer.

Smaller universities can start there and grow towards about 64 GPUs as measured use justifies it.

AI at the Core, Section 6.4

What your starting point changes

The economics differ sharply by starting point. Plans should say which of three cases applies:

  • a new facility, which must fund building works, power, cooling and an operations team
  • an extension of an existing data centre, where the incremental cost is mainly hardware, storage and networking (your starting point)
  • a federated node hosted by a partner institution, where the university pays for capacity and support rather than a facility

Plans should also show both the incremental operating cost and the full economic cost over five years, including replacing shared plant such as cooling.

An existing data centre lowers the first but not the second.

Competitive grants pay for use, through access charges and overheads, rather than for standing capacity, so neither is covered unless use is high and predictable.

AI at the Core, Section 7.2

Also for this kind of institution

Access alone is rarely enough: companies, especially SMEs, want expertise, testing and specialist services as well as GPU capacity (Section 6.9).

AI at the Core, Section 7.5

The three-year start below is the report’s sequence for this kind of institution.

Before you buy

Start by taking stock of the AI compute that already exists across the institution, its region and national programmes, and make it shareable.

Then add capacity in tranches as measured demand grows.

The operating plan matters as much as the capital bid: a university that does not plan for running costs risks expensive equipment that sits idle.

AI at the Core, Section 7.6 and Section 7.4

Table 5. Indicative costs of a university AI research stack (orders of magnitude, 2026).

LayerTypical starting scaleCapitalAnnual running cost
Owned GPU cluster16 to 256 Hopper-generation GPUs€0.5M–€14.4M ($0.6M–$16M)287Maintenance contracts, plus power below
Power and cooling2 to 32 eight-GPU systems at up to about 10 kW each288–€0.05M–€0.8M
Research engineering and AI operations6 to 12 engineers–€0.6M–€1.2M
Data curation and governance2 to 4 specialists for one or two priority datasets–€0.2M–€0.4M
Verification and research integrity2 to 3 specialists in formal methods, statistics and reproducibility–€0.2M–€0.3M
AI governance, risk and compliance1 to 2 specialists in data protection, research ethics and research security, supporting an accountable owner in an existing senior post–€0.1M–€0.2M
Self-driving laboratory in one domainFrom open-hardware platforms costing a few hundred to a few thousand dollars, through conventional automated set-ups of about $50,000, to a research-grade robot scientist costing about £1M ($1.3M)289290291€0.05M–€1.2M1 to 3 technicians: €0.1M–€0.3M
Frontier model accessInstitution-wide–Varies; free and discounted academic programmes exist5154

Scroll sideways to see the whole table.

The staff and power figures are my estimates: staff at a fully loaded cost of about €100,000 a year per engineer or specialist (experienced AI engineers can cost considerably more, while deeper automation could reduce headcount over time), and power at full load, with cooling overhead, at about €0.20 per kWh.

A plain-text summary of this plan, to paste into a note or an email.

Show the summaryHide the summary
AI at the Core: plan your stack
https://aiatthecore.org/stack/?type=regional&start=extension&scale=16

Institution: Regional or technical university
Starting point: An extension of an existing data centre
First scale: A 16-GPU node

Priorities (Section 6.2): Regional and technical universities, including US regional public universities, should prioritise distinctive regional and industry data, applied domain models, an operations team built from existing engineering staff, a right-sized owned node, and federated access for large runs. An institution that already has a data centre, cooling and operations staff can also host equipment on behalf of others, which is cheaper than each building its own.
Advantage: close industry relationships.
Risk: spreading too thin.

Capital (Section 7.2): As an order of magnitude, an owned node of 16 GPUs, enough for inference, fine-tuning and teaching, costs roughly €0.5M to €0.9M ($0.6M to $1M) in hardware alone.
Running: A minimal node of 16 GPUs, run and supported by two or three engineers, costs roughly €0.25M to €0.35M a year to operate. For a modest stack, annual running costs can match or exceed the whole capital cost.
Full stack (Table 5): Taken together, Table 5 implies annual running costs of roughly €1.3M to €3.2M before maintenance contracts and model access. Staff are the largest recurring cost.

Starting point (Section 7.2): Plans should say which of three cases applies: an extension of an existing data centre, where the incremental cost is mainly hardware, storage and networking.
Plans should also show both the incremental operating cost and the full economic cost over five years, including replacing shared plant such as cooling. An existing data centre lowers the first but not the second.
Competitive grants pay for use, through access charges and overheads, rather than for standing capacity, so neither is covered unless use is high and predictable.

Help with running costs (Section 7.4): EU law allows the EuroHPC Joint Undertaking to meet up to 50% of the operating costs of the high-end supercomputers it co-owns, and up to 35% for mid-range systems. In the US, NSF funds operating costs of up to 15% of the acquisition cost a year, for up to five years, for a handful of university-hosted national computing resources selected through competition. The UK has committed to a multi-year funding model for public compute, and its National Compute Resource model gives hosts selected by competition up to £2 million a year towards operations. The INSPIRE call makes operating salaries, and maintenance beyond the project's life, ineligible. Research Ireland's 2025 infrastructure programme pays for equipment, up to two years of maintenance and consumables, and training. Staff salaries are not eligible but count towards the host's cost share. University-hosted infrastructure outside those selected systems generally has no equivalent. Operating costs therefore come from host budgets, industry membership, overheads on research grants, research centre roles and paid access.

Sharing with companies (Section 7.5): Research Ireland builds it into its infrastructure grants as the 80:20 rule, which gives grantees a clear framework: paid use by companies under contract or rental may take up to a fifth of annual capacity, charged at full market rate. For AI compute, however, a fifth of the capacity of a 16-GPU node is about 28,000 GPU hours a year: enough for a handful of company projects, but not for a sustained commercial service.

First three years (Section 7.3, the report's sequence for a regional or technical university): Year 1: foundations. Year 2: first assets. Year 3: scale on evidence.

Seven questions for leaders (Section 6.3):
1. Do we know what AI compute we have today, and who owns the plan for it?
2. Where do we sit in national and international infrastructure: what will we host, what will we access, and what will we contribute?
3. Is AI treated as a method across all our research, or as one theme among many?
4. Where do we hold distinctive data or expertise, and do we have the rights to use it?
5. How will we verify AI-generated research and govern its use, and who is accountable, with the authority to stop it?
6. How will operating costs and refresh be met once capital grants are spent?
7. Is our campus being designed for compute, data and automation, and for the companies that will want to use them?

The report's figures; orders of magnitude, 2026. Nothing here is calculated. The capital figures cover hardware only, and the running costs assume a new team.
Source: AI at the Core, Barry Downes, Sure Valley Ventures. Version 1.0, 24 November 2026.
Section 7.4

Capital grants rarely pay to run what they buy.

Running costs are harder to fund than capital, and most infrastructure programmes are designed that way: they pay for equipment and expect the host institution to provide the people.

European Union EuroHPC Joint Undertaking

Unit % of operating costs

up to 50%

of the operating costs of the high-end supercomputers it co-owns

up to 35% for mid-range systems

EU law allows the EuroHPC Joint Undertaking to meet up to 50% of the operating costs of the high-end supercomputers it co-owns, and up to 35% for mid-range systems.

United States NSF

Unit % of acquisition cost, a year

up to 15%

of the acquisition cost a year

In the US, NSF funds operating costs of up to 15% of the acquisition cost a year, for up to five years, for a handful of university-hosted national computing resources selected through competition.

United Kingdom National Compute Resource

Unit £ a year, per host

up to £2M

a year towards operations

The UK has committed to a multi-year funding model for public compute, and its National Compute Resource model gives hosts selected by competition up to £2 million a year towards operations.

Ireland INSPIRE

Unit None

Capital only

Operating salaries ineligible

The INSPIRE call makes operating salaries, and maintenance beyond the project's life, ineligible. Research Ireland's 2025 infrastructure programme pays for equipment, up to two years of maintenance and consumables, and training. Staff salaries are not eligible but count towards the host's cost share.

Each funder is drawn in its own unit. The units differ, so the four are not directly comparable.

University-hosted infrastructure outside those selected systems generally has no equivalent. Operating costs therefore come from host budgets, industry membership, overheads on research grants, research centre roles and paid access.

AI at the Core, Section 7.4. The number of UK hosts drawn is illustrative.

Section 7.5

Paid use by industry is capped at a fifth: about 28,000 GPU hours a year on a 16-GPU node.

Research Ireland builds it into its infrastructure grants as the 80:20 rule, which gives grantees a clear framework: paid use by companies under contract or rental may take up to a fifth of annual capacity, charged at full market rate.

For AI compute, however, a fifth of the capacity of a 16-GPU node is about 28,000 GPU hours a year: enough for a handful of company projects, but not for a sustained commercial service.

AI at the Core, Section 7.5. One column is one GPU’s year. Beyond these limits, commercial use usually needs separately funded capacity, priced on market terms, which is a natural opportunity for co-investment by developers, investors and industry partners.

Section 7.3 · the report’s sequence for a regional or technical university

The first three years: foundations, first assets, then scale on evidence.

For a regional or technical university, I would sequence the first three years as follows.

Year 1
foundations
  • Appoint a single programme owner.
  • Take stock of compute and data, including capacity elsewhere in the institution and region that could be shared, and agree two or three priority domains.
  • Secure federated access to national and international machines, and build a small owned node sized to measured demand, or share one hosted by a partner with the facilities to run it.
  • Hire the first four to six of an eventual six to 12 research engineers.
  • Name an accountable owner for AI governance, with the policies and authority to pause work set out in Section 6.12.
Year 2
first assets
  • Prepare one distinctive dataset for AI use with an industry partner;
  • adapt an open domain model on it;
  • pilot a low-cost self-driving laboratory in the domain with the strongest industry pull;
  • and launch an industry membership offer for the campus.
Year 3
scale on evidence
  • Expand the cluster in tranches, towards about 64 GPUs if measured use justifies it;
  • move to a research-grade laboratory only if the pilot has produced data and partners;
  • and bid to host a regional node in national programmes, using the track record built in the first two years.

AI at the Core, Section 7.3, written for a regional or technical university.

Section 6.3

Seven questions every university leader should be able to answer.

  1. Do we know what AI compute we have today, and who owns the plan for it?
  2. Where do we sit in national and international infrastructure: what will we host, what will we access, and what will we contribute?
  3. Is AI treated as a method across all our research, or as one theme among many?
  4. Where do we hold distinctive data or expertise, and do we have the rights to use it?
  5. How will we verify AI-generated research and govern its use, and who is accountable, with the authority to stop it?
  6. How will operating costs and refresh be met once capital grants are spent?
  7. Is our campus being designed for compute, data and automation, and for the companies that will want to use them?

AI at the Core, Section 6.3; briefing, “Seven questions for leaders”.